Skip to content
VerticaBuild · Design
Prime Hospital — Acute Care Hospital
Back to Projects
Hospitals

Prime Hospital

Toronto, Canada2023

Location

Toronto, Canada

Year

2023

Area

96,000 m²

Client

Prime Health Authority

Type

Acute Care Hospital

Prime Hospital provides 600 beds, 22 operating theatres and a Level-1 trauma centre. Ward wings are organised to maximise daylight and views for patient recovery, while a rational clinical backbone streamlines staff and logistics flows.

The challenge

Delivering a fully operational, infection-resilient hospital on a live medical campus.

The result

Opened on schedule with a 30% reduction in average patient recovery times reported in year one.

Prime Hospital gallery
Prime Hospital gallery
Prime Hospital gallery
Process

Construction stages

The key phases that brought this project to completion.

01

Site logistics

Phased works maintaining access to existing facilities.

02

Structure

Seismically isolated frame protecting critical care areas.

03

Services

Redundant MEP and medical gas systems installed.

04

Commissioning

Rigorous validation of clinical environments.

Materials

Materials & finishes

A curated selection of materials that define the character and quality of this project.

Antimicrobial surfaces
Sound-rated glazing
Seamless flooring
Stainless steel
Services

Services provided

The full range of expertise we brought to this project.

Technology

Technologies used

HEPA filtration

Modular operating theatres

Seismic isolation

Let's work together

Have a similar project in mind?

Whether you are planning a new build, renovation or interior fit-out, our team is ready to bring your vision to life.