Skip to content
VerticaBuild · Design
Horizon Industrial Park — Logistics & Distribution
Back to Projects
Industrial

Horizon Industrial Park

Rotterdam, Netherlands2022

Location

Rotterdam, Netherlands

Year

2022

Area

140,000 m²

Client

Horizon Logistics BV

Type

Logistics & Distribution

Horizon Industrial Park comprises three high-bay distribution units totalling 140,000 m², designed for automated storage and rapid throughput. A vast rooftop and carport solar array offsets operational energy toward net-zero.

The challenge

Combining ultra-fast construction with net-zero operational ambitions.

The result

Delivered in 11 months and operating carbon-neutral from day one.

Horizon Industrial Park gallery
Horizon Industrial Park gallery
Horizon Industrial Park gallery
Process

Construction stages

The key phases that brought this project to completion.

01

Earthworks

Ground improvement and laser-level slabs.

02

Steel frame

Pre-engineered portal frames rapidly erected.

03

Envelope

Insulated composite cladding installed.

04

Energy

Rooftop and carport PV arrays commissioned.

Materials

Materials & finishes

A curated selection of materials that define the character and quality of this project.

Pre-engineered steel
Composite cladding
Power-floated concrete
PV modules
Services

Services provided

The full range of expertise we brought to this project.

Technology

Technologies used

Automated racking

Solar carport

EV fleet charging

Let's work together

Have a similar project in mind?

Whether you are planning a new build, renovation or interior fit-out, our team is ready to bring your vision to life.